CBK Electrical Services was awarded the contract by DPR Controls Ltd to provide an electrical installation for 4 FIBC dischargers.
The project was broken down into two parts:
1. To design and install a containment & cabling system on the individual FIBC dischargers before transportation to site.
2. To design and install a containment & cabling system from the new control panel to the individual FIBC dischargers on site.
CBK Electrical Services was required to provide all final documentation at the completion stage of the project: Cable schedules, ATEX Loop drawings, ATEX Cable line drawings, ATEX Inspection schedules.
The overall installation needed to be compliant for installations into an explosive atmosphere environment.
Locations:
On-Site Installation of FIBC Dischargers – Sun Chemicals, Yate, Bristol